Edible cone production assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12089600
APP PUB NO 20220408736A1
SERIAL NO

17361278

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An edible cone production assembly for streamlined production of edible cones includes a conveyor, which comprises a pair of belts. A platform is engaged to and extends between the belts. A sheet, which is resiliently flexible, is engaged to the platform. A hopper, which is engaged to the conveyor, contains a batter, and portions the batter onto the sheet. A heating unit substantially encompasses a section of the conveyor between the first end and a second end of the conveyor. A guide is engaged to the conveyor within the heating unit and is positioned to selectively engage a plurality of forming units engaged to the platform as it traverses the heating unit to mold the batter into a cone as the heating unit bakes the batter. The cone drops from the platform as the platform rounds an end of the conveyor. The platform is one of a plurality of platforms.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ANDERSON CARROLLQUINCY MA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anderson, Carroll Quincy, US 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 17, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 17, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 17, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00