Cyclone separator particularly for a powder recovery device of a powder coating system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12090494
APP PUB NO 20230111882A1
SERIAL NO

18045721

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cyclone separator for a powder recovery device of a powder coating system includes an inlet region with an inlet for a mixed flow of powder/air, a separation region adjoining the lower end region of the inlet region for the centrifugal separation of at least a portion of the powder contained in the mixed flow, and a powder collecting region connected or connectable to the lower end region of the separation region for collecting the powder separated in the separation region. The powder collecting region is shiftable relative to the separation region between a first position in which the powder collecting region is aligned in flush connection with the lower end region of the separation region and a second position in which the powder collecting region is not aligned in flush connection with the lower end region of the separation region.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GEMA SWITZERLAND GMBH9200 GOSSAU

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Steiger, Peter Gossau, CH 18 255
Studerus, Thomas Engelburg, CH 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 17, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 17, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 17, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00