Power generator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12092065
APP PUB NO 20230008924A1
SERIAL NO

17782849

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A wave power generator includes a box-shaped body having an inner chamber containing a first gyroscopic device that includes a first frame hinged to the body around a first axis, a first gyroscope being carried by the first frame in a rotatable manner around a second axis perpendicular to the first axis, a first actuator being carried by the first frame to rotate the first gyroscope around the second axis, and a first converter device that converts rotational mechanical energy into electric energy that is mechanically coupled to the first frame. The first converter device is connected to a stabilizing device. A second gyroscopic device includes a second frame hinged to the body around a third axis transversal to the first axis.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ENI S P A00144 ROMA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bonfanti, Mauro Montodine, IT 2 0
Bracco, Giovanni Turin, IT 3 1
Carapellese, Fabio Andria, IT 1 0
Mattiazzo, Giuliana Collegno, IT 4 4
Michetti, Vincenzo San Donato Milanese, IT 1 0
Sirigu, Sergej Antonello Osini, IT 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 17, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 17, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 17, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00