A method for enlarging a crushed section of a ductile pipe. A wire rope having a bead or plurality of beads attached to the rope is placed in a ductile pipe. When a series of beads is used, each of the beads is sequentially larger. The wire rope is pulled through the crushed section, and the ductile pipe conforms to the larger diameter of the beads. The crushed section of pipe may be expanded so that a larger wire rope suitable for pipe extraction may be passed through. Alternatively, the pipe may be reformed and expanded to near or greater than its original size. The pipe may then be coated or a smaller slip-lined pipe may be placed within the original pipe.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE CHARLES MACHINE WORKS INCPERRY OK

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Crane, Robert F Nekoosa, US 88 1155
Randa, Mark D Oconomowoc, US 47 262
Wentworth, Steven W Scottsdale, US 102 1479

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 17, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 17, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 17, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00