Experimental simulation device for hydrogen production by in-situ conversion of gas reservoir and use method thereof

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12098073
SERIAL NO

18589455

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An experimental simulation device for hydrogen production by in-situ conversion of a gas reservoir comprises a gas source, a plurality of groups of reactors and an analysis monitoring device, wherein the gas source comprises a methane tank, a helium tank, an oxygen tank and a water vapor generator, the gas source can supply gas to the reactors separately, the in-situ hydrogen production is simulated in the reactors; and meanwhile, a use method of the experimental simulation device for hydrogen production by in-situ conversion of the gas reservoir can achieve accurate simulation of the multi-stage in-situ hydrogen production and multi-well group cooperative hydrogen production processes of different types of gas reservoirs in actual production by adjusting connection states of the plurality of groups of reactors. The experimental result in the present invention can be closer to the actual production.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOUTHWEST PETROLEUM UNIVERSITYCHENGDU SICHUAN 610500

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Deng, Peng Chengdu, CN 16 44
Ding, Qunchao Chengdu, CN 2 0
Jia, Chunsheng Chengdu, CN 4 0
Peng, Xiaolong Chengdu, CN 6 5
Wang, Chaowen Chengdu, CN 7 4
Zhang, Liehui Chengdu, CN 10 3
Zhao, Yulong Chengdu, CN 15 6
Zhu, Suyang Chengdu, CN 4 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 24, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 24, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 24, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00