Supercritical hydrothermal combustion device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12098845
APP PUB NO 20230068390A1
SERIAL NO

17815165

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A supercritical hydrothermal combustion device comprises a main enclosure and a top cap. A partition is mounted in the main enclosure and divides the interior of the main enclosure into a main combustion space and a mixing space. The top cap is provided with a primary fuel inlet, an oxidant inlet and a secondary fuel inlet. A high-temperature ignition bar sleeve, having a high-temperature ignition bar arranged therein, is disposed in the top cap. A combustion sleeve, having a stable combustion space formed therein, is mounted at a bottom of the top cap, and has a top communicated with the high-temperature ignition bar sleeve and the oxidant inlet, as well as a bottom communicated with the main combustion space. The secondary fuel inlet and a secondary oxidant inlet are communicated with the main combustion space. Supercritical hydrothermal combustion is realized to generate a hybrid thermal fluid or treat organic wastes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
XI'AN JIAOTONG UNIVERSITYXI'AN JIAOTONG UNIVERSITY NO 28 XIANNING WEST ROAD XI'AN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cui, Chengchao Xi'an, CN 1 0
He, Wenqing Xi'an, CN 8 5
Jiang, Zhuohang Xi'an, CN 1 0
Li, Yanhui Xi'an, CN 51 68
Li, Zicheng Xi'an, CN 16 219
Wang, Shuzhong Xi'an, CN 20 54
Zhang, Jie Xi'an, CN 1052 8750

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 24, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 24, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 24, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00