Capacitor and method for manufacturing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12100556
APP PUB NO 20230009176A1
SERIAL NO

17784748

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A second busbar is provided that has a second electrode terminal and a second connection terminal. A first busbar is provided that has a first electrode terminal, a lateral side coupler, an overhang, and a first connection terminal. The first electrode terminal and/or the second electrode terminal has a protruding piece for connection (connecting protrusion). This protruding piece is elastically depressible in response to contact with an electrode surface of a capacitor element unit inserted from an opposite side of the lateral side coupler across a space between the first and second electrode terminals.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NICHICON CORPORATION551 NIJODEN-CHO KARASUMADORI OIKE-AGARU NAKAGYO-KU KYOTO-SHI KYOTO 6040845

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mori, Takashi Kyoto, JP 309 3137
Yamamoto, Masaya Kyoto, JP 304 4288

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 24, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 24, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 24, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00