Generator of a vortex braid broken up into a system of toroid vortices

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12102971
APP PUB NO 20230130758A1
SERIAL NO

17911905

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a generator and its operation and use for generating toroidal and spatial vortices in a liquid. It comprises a rotationally symmetrical stator housing with an inlet opening and an eccentric outlet opening. It further comprises a rotor rotatably arranged in the stator housing with radially outwardly extending channels in constant fluid connection to the inlet opening. The rotor comprises a rotor disc, radially outside of the rotor with a side surface with inner notches in fluid connection to the rotor channels. The stator housing comprises a stator disc comprising a side surface with stator notches. When these notches face each other due to rotation of the rotor disc, a periodical liquid flow from the inner notches to the stator notches is formed and toroidal vortices are generated in the portioned liquid by shear stress as the portions of liquid move back and forth in the notches.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VOZYAKOV IGORNEW PROVIDENCE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shcheblanov, Aleksandr New Providence, BS 2 0
Vozyakov, Igor New Providence, BS 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00