Green method for preparing jute stem-supported catalyst

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12102984
APP PUB NO 20240278216A1
SERIAL NO

18606738

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A solid-supported Pd catalyst is suitable for C—C bond formation, e.g., via Suzuki-Miyaura and Mizoroki-Heck cross-coupling reactions, with a support that is reusable, cost-efficient, regioselective, and naturally available. Such catalysts may contain Pd nanoparticles on jute plant sticks (GS), i.e., Pd@GS, and may be formed by reducing, e.g., K2PdCl4 with NaBH4 in water, and then used this as a “dip catalyst.” The dip catalyst can catalyze Suzuki-Miyaura and Mizoroki-Heck cross coupling-reactions in water. The catalysts may have a homogeneous distribution of Pd nanoparticles with average dimensions, e.g., within a range of 7 to 10 nm on the solid support. Suzuki-Miyaura cross-coupling reactions may achieve conversions of, e.g., 97% with TOFs around 4692 h−1, Mizoroki-Heck reactions with conversions of, e.g., a 98% and TOFs of 237 h−1, while the same catalyst sample may be used for 7 consecutive cycles, i.e., without addition of any fresh catalyst.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KING FAHD UNIVERSITY OF PETROLEUM AND MINERALSDHAHRAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shaikh, M Nasiruzzaman Dhahran, SA 20 20

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00