Aero-braking assisted ascending node plane changes using differential J2 precession

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12103712
APP PUB NO 20230356861A1
SERIAL NO

18143931

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of moving a spacecraft from an initial orbit to a final orbit includes providing a spacecraft with thrusters traveling in an initial orbit that has a first RAAN. Thrusters are activated to move the spacecraft into a transfer orbit having more eccentricity than the initial orbit. A RAAN of the transfer orbit changes over time toward a target RAAN. The spacecraft enters an aerobraking orbit wherein the spacecraft is exposed to increased atmospheric drag to reduce orbit energy and reduce an apoapsis radius. Thrusters may be activated to increase the periapsis radius of the aerobraking orbit and cause the spacecraft to move into the final orbit, the final orbit having a final RAAN different from the first RAAN.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KATALYST-ATOMOS TRANSITION LLC121 E BIRCH AVENUE SUITE 307 FLAGSTAFF AS 86001

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wilson, Kieran Lafayette, US 3 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00