Wiring board and method for manufacturing wiring board

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12107327
APP PUB NO 20230369751A1
SERIAL NO

18200712

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A wiring board includes: a substrate having transparency; a plurality of first wirings which are arranged on an upper surface of the substrate and extend in a first direction and each of which has a back surface in contact with the substrate and a front surface facing an opposite side of the back surface; and has a back surface in contact with the substrate and a front surface facing an opposite side of the back surface. The first wiring has a pair of side surfaces which extend in the first direction and are adjacent to the back surface of the first wiring, and each of the pair of side surfaces of the second wiring is recessed inward. The second wiring has a pair of side surfaces which extend in the second direction and are adjacent to the back surface of the second wiring.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DAI NIPPON PRINTING CO LTDTOKYO 162-8001

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matsuura, Daisuke Tokyo-to, JP 29 102
Suzuki, Koichi Tokyo-to, JP 389 3939
Take, Seiji Tokyo-to, JP 35 354

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00