Channel state information (CSI) report sending and receiving methods, devices and electronic devices

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12107652
APP PUB NO 20240048204A1
SERIAL NO

18380258

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are methods and devices for transmitting a reference signal. The method comprises: determining a sequence parameter associated with the reference signal, where the sequence parameter is used for generating a sequence, and the sequence parameter hops once every X time domain symbols, where X is an integer greater than or equal to 1; determining the reference signal according to the determined sequence parameter; and transmitting the reference signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZTE CORPORATION518057 MINISTRY OF JUSTICE ZHONGXING BUILDING SOUTH SCIENCE AND TECHNOLOGY ROAD NANSHAN DISTRICT HI TECH INDUSTRIAL PARK SHENZHEN GUANGDONG SHENZHEN CITY GUANGDONG PROVINCE 518057

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Yijian Guangdong, CN 306 1656
Jiang, Chuangxin Guangdong, CN 390 680
Li, Yu Ngok Guangdong, CN 308 1361
Lu, Zhaohua Guangdong, CN 705 2021
Wu, Hao Guangdong, CN 930 3100
Zhang, Shujuan Guangdong, CN 304 518

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00