Process and printed article

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12109618
APP PUB NO 20210221093A1
SERIAL NO

17197266

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process includes forming a printed article having an external surface and at least one microfeature with an internal surface by additive manufacture, coating the external surface and the internal surface of the printed article with a metallic microlayer to form a coated article, and densifying the coated article to form a component. After formation, the printed article has a porosity such that the printed article is not at full density. A densified component includes a printed article having an external surface and at least one microfeature with an internal surface and a metallic microlayer coating the external surface and the internal surface of the printed article. The printed article is formed by additive manufacture.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON ROAD GREENVILLE SC 29615

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cui, Yan Greer, US 229 1510
Kottilingam, Srikanth Chandrudu Simpsonville, US 217 1526
Pabla, Surinder Singh Greer, US 59 311
Ucok, Ibrahim Simpsonville, US 14 40

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 8, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 8, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 8, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00