Re-sealer for a multi-ply cutter

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12109719
SERIAL NO

17341186

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A re-scaler for a multi-ply cutter includes a cutter table and a cutter frame. The cutter frame includes a fixed re-sealer end attached to an overlay film. The overlay film covers a workpiece on the cutter table through a movable re-sealer end, which is longitudinally displaced along the table and includes a swing arm on each side of the table. The cutter frame further includes a mandrel attached between the swing arms of the movable re-sealer end and the overlay film. Each of the swing arms include an actuator attached thereto, providing rotation of each of the swing arms in a first direction about an axis of the actuator thereby raising the mandrel above the table. The actuators also include a down stop preventing rotation of the swing arm in a second direction thereby establishing a minimum height of the mandrel above the table.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GERBER TECHNOLOGY LLC24 INDUSTRIAL PARK ROAD WEST TOLLAND CT 06084

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pan, Hong Glastonbury, US 24 160
Poulin, Brett Tolland, US 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 8, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 8, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 8, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00