Procedure for hardening slides of a perforating press and the slides obtained

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12110565
APP PUB NO 20230175089A1
SERIAL NO

18061782

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a method of hardening slides of a perforating press comprising providing a steel beam; hardening of the steel beam in a vacuum furnace; tempering the steel beam twice; first straightening of the steel beam at a temperature of 20° C.±10° C.; milling of an at least partially continuous sawtooth profile, along a longitudinal direction of the steel beam, on a first side of the steel beam; wherein, after milling the at least partially continuous sawtooth profile on the first side of the steel beam, a second side of the steel beam, lying opposite the first side, is hardened by means of induction currents, after which the steel beam is again tempered twice and after which the steel beam is straightened a second time at a temperature of 20° C.±10° C. The invention also relates to a slide for a perforating press hardened according to the method.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOENEN TECHNOLOGY NVROESELARE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
De, Sutter Luc Roeselare, BE 5 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 8, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 8, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 8, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00