Installation for the combined conversion of wave, wind and solar energies into electrical energy

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12110875
APP PUB NO 20240209837A1
SERIAL NO

18085729

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention refers to a combined power generator for near shore area wherein on a support frame are mounted, at the base a vertical wave turbine coupled by a ratchet coupling to a wind turbine coupled in its turn by a speed raising coupling to an electric generator and above a photovoltaic platform with solar tracking system, with bi-facial photovoltaic panels, with a system of mirrors for the reflection of light on the back of the bi-facial photovoltaic panels, a hybrid controller and an inverter for taking over the electricity from the electric generator and the photovoltaic panels respectively and the transformation to the corresponding parameters for sending into the electrical network. By placing the three convertors vertically the energy efficiency on the surface unit in near-shore areas increase. Other advantages of the installation are: constructive simplicity, low price of construction, maintenance and operation, wave breaker.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GHINDA NICOLAEHAMMOND

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ghinda, Nicolae Hammond, CA 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 8, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 8, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 8, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00