Systems and methods for high strength titanium rod additive manufacturing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12115580
APP PUB NO 20240207936A1
SERIAL NO

18463786

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of titanium rod additive manufacturing may comprise: mixing a plurality of powdered metals comprising titanium, iron, vanadium, and aluminum to produce a powder blend; isostatic pressing the powder blend to form a billet having a cross-sectional profile; cutting the billet to form a rod feedstock having the first cross-sectional profile; loading the rod feedstock into an additive manufacturing machine configured to deposit the rod feedstock; and producing a metallic component from the rod feedstock.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GOODRICH CORPORATION4 COLISEUM CENTRE 2730 WEST TYVOLA ROAD CHARLOTTE NC 28217-4578

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Haynes, Noel C Etobicoke, CA 8 12
Mironets, Sergey Burlington, CA 120 839

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 15, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 15, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 15, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00