Destination calls across multiple elevator groups

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12116240
SERIAL NO

16532833

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An elevator system includes a first elevator group controller configured to control a first elevator car of a first elevator group; a second elevator group controller configured to control a second elevator car of a second elevator group, the second elevator group controller in bi-directional communication with the first elevator group controller; a destination entry device configured to receive a destination call from a passenger, the destination call identifying a source floor and a destination floor; at least one of the first elevator group controller and the second elevator group controller determining that a journey from the source floor to the destination floor requires a first phase utilizing the first elevator group and a second phase utilizing the second elevator group; at least one of the first elevator group controller and the second elevator group controller allocating the first elevator car and allocating the second elevator car.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OTIS ELEVATOR COMPANYONE CARRIER PLACE FARMINGTON CT 06032

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gangisetti, BVSP Ravichand Andhra Pradesh, IN 2 2
Pusala, Rajinikanth Telangana, IN 10 24

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 15, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 15, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 15, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00