Green production process for iodate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12116272
APP PUB NO 20220298016A1
SERIAL NO

17608773

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of electrochemical synthesis, and specifically relates to a green production process for an iodate. The process includes preparing lithium iodate by means of an electrolysis method, and then reacting the prepared lithium iodate with an iodide to prepare the iodate. In the process, a mother liquor is recycled, no effluent waste is produced, a product yield is high, and the generation of a large amount of waste salt is avoided. The process is green and environmentally friendly. During the synthesis process of preparing lithium iodate by means of an electrolysis method, using a clean electrolysis process does not require the addition of an oxidant and other additional original auxiliary materials as required by a chemical method, the original auxiliary materials are simple, and a produced iodate product has a high quality.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAIAN HAVAY GROUP CO LTDDAWENKOU INDUSTRIAL PARK DAIYUE DISTRICT TAI'AN SHANDONG 271000

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Hecun Tai'an, CN 2 0
Ren, Shuzhen Tai'an, CN 3 0
Sun, Guibin Tai'an, CN 2 0
Wang, Jiawang Tai'an, CN 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 15, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 15, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 15, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00