Process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12116538
APP PUB NO 20210355392A1
SERIAL NO

17318328

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for the manufacture of one or more useful products comprises: gasifying a carbonaceous feedstock comprising waste materials and/or biomass in a gasification zone to generate a raw synthesis gas; supplying at least a portion of the raw synthesis gas to a clean-up zone to remove contaminants and provide a clean synthesis gas; supplying the clean synthesis gas to a first further reaction train to generate at least one first useful product and a tailgas; and diverting selectively on demand a portion of at least one of the carbonaceous feedstock, the clean synthesis gas, the tailgas and the light gas fraction to heat or power generation within the process, in response to external factors to control the carbon intensity of the overall process and enable GHG emission savings.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VELOCYS TECHNOLOGIES LTDOXFORD

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Deshmukh, Soumitra R Houston, US 12 8
Greager, Ivan Philip Houston, US 17 22
Harris, Roger Allen Houston, US 21 18
King, Neil Alexander Oxford, GB 13 12
Qiu, Zheyan Sugar Land, US 8 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 15, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 15, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 15, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00