Formation method for slag flow, production method for organic compound, production method for particles, and extraction method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12116643
SERIAL NO

17666590

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure provides a formation method for a slug flow that includes combining a first liquid and a second liquid that is not compatible with the first liquid, moving the second liquid that is combined with the first liquid to an upstream side with respect to a combination point of the first liquid and the second liquid in a flow direction of the first liquid, and moving, by the first liquid, the second liquid that is retained on the upstream side with respect to the combination point of the first liquid and the second liquid in the flow direction of the first liquid, to a downstream side with respect to the combination point of the first liquid and the second liquid in the flow direction of the first liquid, where a density D1 of the first liquid and a density D2 of the second liquid satisfy a relationship of D1>D2, and provides an application thereof.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUJIFILM CORPORATIONTOKYO 106-8620

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Takahashi, Kazunori Kanagawa, JP 127 1524
Unemura, Takeshi Kanagawa, JP 4 38

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 15, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 15, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 15, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00