Flame retardant cellulosic man-made fibers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12116701
APP PUB NO 20200340143A1
SERIAL NO

16758317

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for the production of an oxidized polymer from a tetrakis hydroxyalkyl phosphonium compound comprising NH3 or at least one nitrogen compound comprising at least one NH2 or at least two NH groups, or NH3, comprising the steps of: (a) reacting at least one tetrakis hydroxyalkyl phosphonium compound with NH3 or at least one nitrogen compound in order to obtain a precondensate, wherein the molar ratio of the tetrakis hydroxyakyl phosphonium compound to the nitrogen compound is in the range of 1: (0.05 to 2.0), preferably in the range of 1: (0.5 to 1.5), particularly preferably in the range of 1: (0,65 to 1.2), (b) crosslinking the precondensate obtained in process step (a) with the aid of ammonia to form a crosslinked polymer, (c) oxidizing the crosslinked polymer obtained in step (b) by adding an oxidizing agent to the oxidized polymer, wherein, in step (b), the precondensate from step (a) and the ammonia are each injected by means of a nozzle into a reactor space enclosed by a reactor housing onto a common collision point.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LENZING AKTIENGESELLSCHAFT4860 LENZING

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bisjak, Clemens Seewalchen, AT 7 15
Firgo, Heinrich Vöcklabruck, AT 69 750

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 15, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 15, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 15, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00