Porous stabilized beds, methods of manufacture thereof and articles comprising the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12119148
APP PUB NO 20230317326A1
SERIAL NO

18322748

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed herein is a method comprising disposing a first particle in a reactor; the first particle being a magnetic particle or a particle that can be influenced by a magnetic field, an electric field or a combination of an electrical field and a magnetic field; fluidizing the first particle in the reactor; applying a uniform magnetic field, a uniform electrical field or a combination of a uniform magnetic field and a uniform electrical field to the reactor; elevating the temperature of the reactor; and fusing the first particles to form a monolithic solid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNIVERSITY OF FLORIDA RESEARCH FOUNDATION INC223 GRINTER HALL GAINESVILLE FL 32611

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Allen, Kyle Gainesville, US 9 65
Klausner, James F Gainesville, US 21 417
Mei, Renwei Gainesville, US 14 336
Momen, Ayyoub Mehdizadeh Gainesville, US 18 173

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 15, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 15, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 15, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00