Power distribution module and communication power supply system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12119622
APP PUB NO 20220360054A1
SERIAL NO

17848740

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The power distribution module includes a power busbar, a primary load output module, a secondary load output module, a battery module, and a signal-driven collection module, where each of the primary load output module, the secondary load output module, and the battery module includes a circuit breaker, the power busbar is connected to the circuit breaker, the signal-driven collection module is connected to the circuit breaker to collect a circuit breaker signal, the signal-driven collection module includes a plurality of first signal units sequentially arranged in a first direction, an integer quantity of first signal units are disposed in a connection area in which the signal-driven collection module is connected to each circuit breaker, and each circuit breaker is provided with a second signal unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HUAWEI DIGITAL POWER TECHNOLOGIES CO LTDSHENZHEN 518043

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Feng, Tao Dongguan, CN 177 1037
Guo, Wei Dongguan, CN 345 2714
Yang, Yanxing Dongguan, CN 9 4
Yi, Liqiong Shenzhen, CN 14 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 15, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 15, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 15, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00