Highly textured PEPD tenorite film on steel and method of making the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12123102
SERIAL NO

18424203

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of forming a highly textured tenorite film includes providing a substrate in a pulsed electrophoretic deposition (PEPD) reactor. Tenorite microcrystals, de-ionized water, hydrogen peroxide and sulfuric acid are mixed in the PEPD reactor. A temperature of the PEPD reactor is adjusted to 2-15° C. The highly textured tenorite film is formed on the substrate by electrophoresis having electrophoretic parameters. The electrophoretic parameters include a pulse ON time having a duration of 10 ms to 500 ms, a pulse duty cycle having a range of 0.1 to 0.23, a pulse height having a range of 0.1 to 0.8 kilovolts, and a deposition time having a range of 70 minutes to 2.5 hours.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KING FAISAL UNIVERSITYP O BOX 55110 AL-AHSA 31982

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alshakhs, Mohammed H Al-Hofuf, SA 1 0
Enshasy, Hesham M Al-Ahsa, SA 3 2
Khan, Shabina Bhopal, IN 1 0
Mazher, Javed Al-Ahsa, SA 3 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 22, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 22, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 22, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00