Wire harness for power storage module, and method of producing wire harness

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12125612
APP PUB NO 20230011924A1
SERIAL NO

17783489

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The wire harness includes a base film having flexibility, a cover film covering the base film and having flexibility, and electric wires disposed between the base film and the cover film. The electric wires include first end sections that extend outside the base film and the cover film and second end sections that extend outside from the base film and the cover film from an opposite side from the first end sections. The base film and the cover film include welding portions at which the base film and the cover film are joined with welding.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHATOYOTA-SHI AICHI-KEN 471-8571
SUMITOMO WIRING SYSTEMS LTD1-14 NISHISUEHIROCHO YOKKAICHI-SHI MIE 5108503
SUMITOMO ELECTRIC INDUSTRIES LTDOSAKA-SHI OSAKA 541-0041
AUTONETWORKS TECHNOLOGIES LTDMIE JAPAN MIE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gotoh, Yutaroh Aichi, JP 9 2
Hamamoto, Isamu Mie, JP 15 75
Matsumura, Nobuyuki Mie, JP 41 194
Shimoda, Hiroki Mie, JP 65 431

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 22, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 22, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 22, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00