Pre-roll oil infusion apparatus

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12127582
SERIAL NO

18662163

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Pre-roll infusing apparatus includes fluid vessel, a fluid pump and an infusion needle for spraying fluid into the pre-roll. An elevator includes a tube nest for receiving a support tube containing the pre-roll and selectively raises the pre-roll to be pierced by the needle. A needle heater is supported for travel along the needle as the elevator moves up and down. The elevator tube nest includes a motor-driven rotatable base for rotating the support tube and pre-roll during infusion. A stepper motor equipped with an encoder controls the raising and lowering of the elevator. The needle may include two or more spaced spray ports. A needle pointer indicates to a user the location of the needle spray ports. The fluid vessel includes a stirrer motor, and the current draw thereof is used to determine the viscosity of the fluid. Different support tubes are provided to accommodate different pre-roll styles.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CREDENCE ENGINEERING INC237 W LA VIEVE LANE TEMPE AS 85284

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ellis, James Edward Tempe, US 9 37

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 29, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 29, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00