System and method for the production of synthetic fuels without fresh water

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12129435
APP PUB NO 20230220284A1
SERIAL NO

17771918

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a system for producing synthetic fuels, in particular jet fuel (kerosene), gasoline and/or diesel, comprising:

    a) an apparatus for separately extracting carbon dioxide and water from ambient air,b) a synthesis gas production apparatus for producing a raw synthesis gas comprising carbon monoxide, hydrogen, carbon dioxide and water, the synthesis gas production apparatus having a supply line for carbon dioxide leading from the apparatus for separately extracting carbon dioxide and water from ambient air, a supply line for air and a supply line for water,c) a separating apparatus for separating carbon dioxide and water from the raw synthesis gas produced in the synthesis gas production apparatus,d) a Fischer-Tropsch apparatus for producing hydrocarbons by means of a Fischer-Tropsch process from the synthesis gas from which carbon dioxide and water were separated in the separating apparatus,e) a refining apparatus for refining the hydrocarbons produced in the Fischer-Tropsch apparatus into synthetic fuels,f) a desalination apparatus for desalinating water, the desalination apparatus having a water supply line from the apparatus for separately extracting carbon dioxide and water from ambient air and a water discharge line to the Fischer-Tropsch apparatus, andg) a water purification apparatus, which comprises a water supply line leading from the Fischer-Tropsch apparatus for purifying water produced therein, the system further comprising a pre-reformer for converting hydrocarbons other than methane into methane, carbon oxides, water and hydrogen and i) a water vapor supply line leading from the water purification apparatus to the pre-reformer, ii) a process gas supply line leading from the refining apparatus to the pre-reformer and/or a return gas line leading from the Fischer-Tropsch apparatus to the pre-reformer and iii) a circulation line leading from the pre-reformer to the supply line for water connected to the synthesis gas production apparatus.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EDL ANLAGENBAU GESELLSCHAFT MBHLINDENTHALER HAUPTSTRASSE 145 LEIPZIG 04158

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gambert, Rolf Grimma, DE 2 0
Haid, Michael Ratingen, DE 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 29, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 29, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00