Surface-treated steel sheet

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12129568
APP PUB NO 20230407510A1
SERIAL NO

18035745

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A surface-treated steel sheet includes a steel sheet, and an Ni—Co—Fe alloy layer containing Ni, Co, and Fe on the steel sheet surface. In the thickness direction of the Ni—Co—Fe alloy layer, a Co concentration in the Ni—Co—Fe alloy layer is highest at a position which is on an outermost surface side of the Ni—Co—Fe alloy layer relative to a position where the Ni concentration is highest in the Ni—Co—Fe alloy layer, and which is between the outermost surface of the Ni—Co—Fe alloy layer and a depth of 100 nm from the outermost surface. In the Ni—Co—Fe alloy layer, an Ni-concentrated region in which the Ni concentration increases toward the outermost surface of the Ni—Co—Fe alloy layer is formed between the outermost surface of the Ni—Co—Fe alloy layer and the position where the Co concentration is highest.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL CORPORATION6-1 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 1008071 ?1008071

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dairokuno, Yuta Tokyo, JP 5 3
Goto, Yasuto Tokyo, JP 45 55
Kajii, Yuji Tokyo, JP 2 0
Kawamoto, Kosuke Tokyo, JP 29 442
Shimada, Koki Tokyo, JP 53 124

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 29, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 29, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00