Ground rail transfer device and gauge changing system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12129603
APP PUB NO 20210395952A1
SERIAL NO

17273694

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A ground rail transfer device includes: a support rail provided on the ground and used for unloading a vertical load of a bogie in a rail vehicle; a guide rail provided on the ground and used for driving the bogie to perform a rail transfer operation; and a transition plate provided on the ground and located between a first rail and a second rail which are different in a gauge; wherein a difference between the top surface height of the transition plate and the top surface height of the first rail is equal to a distance between a wheel rim vertex circle and a wheel tread of the rail vehicle.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CRRC TANGSHAN CO LTDNO 3 CHANGQIAN ROAD FENGRUN DISTRICT TANGSHAN HEBEI 063035 063035

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hao, Taoguang Tangshan, CN 1 0
Ma, Yongjiang Tangshan, CN 1 0
Song, Xueyi Tangshan, CN 1 0
Sun, Xiuyu Tangshan, CN 2 0
Wang, Wei Tangshan, CN 2815 17926
Xu, Hongjiang Tangshan, CN 43 30
Zhang, Lijun Tangshan, CN 174 2085
Zhang, Xiaojun Tangshan, CN 120 536
Zhao, Feng Tangshan, CN 242 4082
Zheng, Guangsheng Tangshan, CN 3 0
Zheng, Jianke Tangshan, CN 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 29, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 29, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00