System and method for controlling an electrical power system using a dynamic regulator maximum limit

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12129833
APP PUB NO 20230049606A1
SERIAL NO

17398501

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for controlling an electrical power system connected to an electrical grid having a generator and a power converter includes monitoring a speed condition of the electrical power system. The method also includes dynamically determining at least one regulator maximum limit for at least one regulator of the power converter based on the monitored speed condition. Further, the method includes operating the at least one regulator based on the at least one dynamic regulator maximum limit to avoid overmodulation of the electrical power system during high-slip operation and to improve sub-synchronous control interaction (SSCI) performance of the electrical power system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON ROAD GREENVILLE SC 29615

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Haque, Talha Irfanul Roanoke, US 5 26
Howard, Dustin Brookhaven, US 27 90
Lwin, Min Naing Austin, US 3 7
Vieto, Miranda Ignacio New Haven, US 2 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 29, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 29, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00