Formulation for producing an insulating system, electrical machine and method for producing an insulating system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12131841
APP PUB NO 20210035705A1
SERIAL NO

16968055

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Various embodiments include a sprayable formulation for an insulation system of an electrical machine, the formulation comprising a sprayable resin mixture including: a monomeric and/or oligomeric, at least diepoxidic carbon-based first resin component; and a monomeric and/or oligomeric second resin component based on alkyl-/arylpolysiloxane with at least one glycidyl ester and/or glycidyl ether functionalities; and a curing agent and based on at least one of: anhydride, (poly)amine, and amino- and/or alkoxy-functional alkyl-/arylpolysiloxane.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INNOMOTICS GMBH90441 NÜRNBERG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Übler, Matthias Ursensollen, DE 25 36
Huber, Jürgen Erlangen, DE 30 33
Lang, Steffen Hallerndorf, DE 61 297
Müller, Niels Nuremberg, DE 12 1
Ritberg, Igor Fürth, DE 7 24

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 29, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 29, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00