System with power jet modules and method thereof

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12132190
APP PUB NO 20220037633A1
SERIAL NO

17408214

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A processing system for producing a product material from a liquid mixture includes an array of one or more power jet modules adapted to jet the liquid mixture into one or more streams of droplets and force the one or more streams of droplets into the processing system adapted to process the one or more streams of droplets into the product material. A method for producing a product material, from a liquid mixture on a processing system includes moving each of the one or more power jet modules and be connected to an opening of a dispersion chamber, opening one or more doors of the one or more power jet modules, processing the one or more streams of droplets inside a reaction chamber, closing the one or more doors of the power jets modules and moving each of the one or more power jet modules in a second direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EJOULE INC46750 FREMONT BLVD SUITE 110 FREMONT CA 94538

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Liang-Yuh Saratoga, US 187 3064
Wang, Yan Sunnyvale, US 1171 7294
Yang, Lu Fremont, US 115 358

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 29, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 29, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00