Dust cover, suspension device, and method for manufacturing dust cover

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12140199
APP PUB NO 20210381572A1
SERIAL NO

17410728

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A dust cover is configured to cover an outer side of a damper extending in a predetermined direction. The dust cover includes bellows portions and a flange portion. The bellows portions are inclined alternately toward a radially outer side and a radially inner side in an axial direction. The flange portion extends radially outward from a cylindrical portion of the dust cover. The flange portion protrudes radially outward from the cylindrical portion of the dust cover by a dimension larger than a height dimension in a radial direction between a radially inner end and a radially outer end of each of the bellows portions. A thickness of the flange portion is larger than a thickness of the radially outer end of each of the bellows portions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SUBARU CORPORATION; EXCELL CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kawano, Hiroo Tokyo, JP 3 0
Shimizu, Shoji Kiryu, JP 17 88

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 12, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 12, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 12, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00