Light body connecting structure, light group, and assembling method of light group

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12140295
SERIAL NO

18407350

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A light body connecting structure, a light group, and an assembling method of the light group are provided. The light body connecting structure includes a wiring terminal electrically connected with a light body and a wire. The wiring terminal includes a terminal body and a plug assembly. The terminal body is matched with any opening of a lampshade. The plug assembly is connected with a first end of the terminal body. One end of the wire passes through a second end of the terminal body and is electrically connected with the plug assembly. The plug assembly is connected with the terminal body, so that the plug assembly is connectable to lampshades of different sizes, and the light body connecting structure is adapted and mounted with a light body in any of the lampshades, which is versatile and reduces production cost.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JIANGMEN CITY SHENGDA LIGHTING CO LTD11-1 JINGGANG CHANGSHAN WENHUA DISTRICT SHUI BU TOWN TAISHAN CITY JIANGMEN GUANGDONG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sun, Caiju Jiangmen, CN 3 0
Xu, Haiyan Jiangmen, CN 28 79
Xu, Xiaojun Jiangmen, CN 29 110

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 12, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 12, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 12, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00