Fibre optic pulling grip assembly

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12140815
APP PUB NO 20210364723A1
SERIAL NO

17321401

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fibre optic pulling grip assembly, comprising a sleeve, connection sleeve, swivel pulling eye unit, fitting, clamp, and a securing unit is provided. The sleeve has a sleeve coupling portion and sleeve body. The connection sleeve has a connection sleeve head and connection sleeve body. The swivel pulling eye unit has a pulling eye swivel portion and pulling eye body. The connection sleeve body is configured for fixed assembly of the pulling eye body therewithin, the sleeve coupling portion is configured for fixed assembly of the connection sleeve body therewithin, and the fitting is configured for fixed assembly of the sleeve coupling portion therewithin. The clamp has a clamp securing portion and clamping portion. The securing unit moves longitudinally toward the clamping portion, such that the fitting is moved to assemble to the sleeve coupling portion, applying pressure to the sleeve coupling portion supported by the connection sleeve body.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EZCONN CORPORATION11259 TAIPEI CITY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Pao-chen New Taipei, TW 5 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 12, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 12, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 12, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00