Multilayer ceramic capacitor

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12142440
APP PUB NO 20240013982A1
SERIAL NO

18370652

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multilayer ceramic capacitor includes a laminated body and first and second external electrodes respectively on both end surfaces of the laminated body. When regions where first internal electrodes or second internal electrodes are not present are regarded as side margin portions in a cross section of the laminated body as viewed from the laminating direction, the side margin portions include multiple side margin layers, and the content of Si in the side margin layer closest to the internal electrode is lower than that in the side margin layer other than the side margin layer closest to the internal electrode.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MURATA MANUFACTURING CO LTDNAGAOKAKYO-SHI

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukunaga, Daiki Nagaokakyo, JP 47 372
Moriyama, Koji Nagaokakyo, JP 37 247
Tanaka, Hideaki Nagaokakyo, JP 476 5500

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 12, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 12, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 12, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00