5G system containing a polymer composition

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12142820
APP PUB NO 20210075093A1
SERIAL NO

16995890

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A 5G system comprising at least one antenna element configured to transmit and receive 5G radio frequency signals and at least one electronic component is provided. The antenna element, the electronic component, or both, comprise a polymer composition that includes a liquid crystalline polymer that contains repeating units derived from naphthenic hydroxycarboxylic and/or dicarboxylic acids in an amount of about 10 mol. % or more. Further, the polymer composition exhibits a dielectric constant of about 5 or less and dissipation factor of about 0.05 or less at a frequency of 10 GHz.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TICONA LLC8040 DIXIE HIGHWAY FLORENCE KY 41042

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chiong, Hendrich A Cincinnati, US 13 53
Kim, Young Shin Cincinnati, US 167 1399
McGrady, Christopher Walton, US 43 150
Zhang, Xiaowei Union, US 201 429
Zhao, Xinyu Cincinnati, US 131 902

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 12, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 12, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 12, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00