Four in one infant bath tub

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12144474
APP PUB NO 20230397773A1
SERIAL NO

17836613

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An infant bathing system has a sling for receiving the body of an infant and a tub into which the sling is installed. A second panel of the sling has a first end that is joined to a second end of a first panel. A third panel has leg holes for the infant and a first end that is joined to the second end of the first panel and to the first end of the second panel. A bar connected to the second end of the third panel is adapted to span the tub and to be installed in channels in the tub walls. In one use configuration, the second panel is positioned above the third panel and occludes the leg holes in the third panel. In another use configuration, the third panel is positioned above the second panel and allows use of the leg holes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • FRIDABABY, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hirschhorn, Chelsea Miami, US 12 2
Lee, Stella Los Angeles, US 10 14
Level, Maria Miami, US 4 1
Sauceda, Samuel El Serino, US 10 2
Saxton, Matthew Agoura Hills, US 10 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 19, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 19, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 19, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00