Modular cyclone

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12145160
APP PUB NO 20240091794A1
SERIAL NO

18524388

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cyclone sand separator includes a cyclone body having an inlet, a fluid outlet, and a solids outlet. The inlet is configured to receive a mixed fluid including a solids portion and a fluids portion. The solids outlet is configured to receive the solids portion separated from the fluids portion. The fluid outlet is configured to receive the fluids portion separated from the solids portion. The cyclone sand separator also includes a plurality of inlet inserts having different geometries. The inlet inserts are each configured to be positioned at least partially in the inlet. The inlet inserts are rigid and configured to be fixed in place at least partially in the inlet, such that the inlet inserts do not move with respect to the inlet. The cyclone sand separator also includes a flange configured to be coupled to the selected inlet insert.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ENERCORP ENGINEERED SOLUTIONS INCCALGARY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bowley, Ryan Thomas Calgary, CA 40 202

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 19, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 19, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 19, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00