Gas generator

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12146228
APP PUB NO 20220025526A1
SERIAL NO

17498547

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a gas generator, comprising a water tank and an electrolysis device. The water tank has a first hollow portion for containing electrolyzed water. The electrolysis device is disposed inside the first hollow portion of the water tank for electrolyzing the electrolyzed water to generate a hydrogen-oxygen mixed gas. When the electrolysis device starts to electrolyze the electrolyzed water, the first hollow portion of the water tank is filled with the electrolyzed water for standing at a full level of water. And after the electrolysis device electrolyzed the electrolyzed water, the level of water for the electrolyzed water filled into the first hollow portion of the water tank is higher than 95% of the full level of water. The gas generator of the present invention provides the design for saving space and nearly a zero gas chamber to reduce the possibility of explosions resulting from hydrogen-oxygen mixed gas.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LIN HSIN YUNGSHANGHAI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lin, Hsin-Yung Shanghai, CN 76 263

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 19, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 19, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 19, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00