Wind power plant with power conversion system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12146471
APP PUB NO 20230243338A1
SERIAL NO

18009863

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A wind power plant for providing electrical power to a utility grid is provided, the wind power plant including: at least one wind turbine having a wind turbine generator coupled to a wind turbine rotation shaft to which plural rotor blades are mounted, the wind turbine providing electric power at an output terminal; at least one power conversion system, each including: a plant motor electrically coupled and configured to receive the electric power from the output terminal of the at least one wind turbine and convert it into rotational power of a plant motor shaft; a plant generator mechanically coupled to the plant motor shaft and electrically coupleable to the electric utility grid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS GAMESA RENEWABLE ENERGY INNOVATION & TECHNOLOGY S LAVENIDA DE LA INNOVACIÓN 9-11 SARRIGUREN (NAVARRA) 31621

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matuonto, Marco Alicante, ES 4 1
Rodriguez, Izal José Luis Burlada, ES 9 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 19, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 19, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 19, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00