System for providing dynamic feedback for selective adhesion PCB production

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12150248
APP PUB NO 20230072115A1
SERIAL NO

17901417

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for providing selective adhesion printed circuit board (PCB) production comprises a conveyor mechanism, a curing system, and a computer. The conveyor mechanism is configured to convey a series of selective adhesion blanks, wherein each selective adhesion blank is utilized to produce a PCB and includes a flexible film, a substrate, a conductive layer, and a curable adhesive. The conductive layer is formed from electrically conductive material and adhered to the substrate. The curable adhesive is positioned between the flexible film and the conductive layer and is configured to selectively bond with the conductive layer when the curable adhesive is cured. The curing system is configured to cure the curable adhesive. The computer includes a processing element configured or programmed to: receive a plurality of PCB designs, and direct the curing system to cure the curable adhesive of a plurality of selective adhesion blanks for each PCB design.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HONEYWELL FEDERAL MANUFACTURING & TECHNOLOGIES LLC14520 BOTTS ROAD KANSAS CITY MO 64147

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hatch, Jonathan Douglas Cleveland, US 15 14
Hatch, Stephen McGarry Blue Springs, US 17 20

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 19, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 19, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 19, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00