Continuous solid organic matter pyrolysis polygeneration system and method for using same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12152196
APP PUB NO 20240166951A1
SERIAL NO

17744619

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A continuous solid organic matter pyrolysis polygeneration system and method for using the system is disclosed. The pyrolysis polygeneration system mainly includes a processing system, a drying furnace, a pyrolysis furnace, a cooling furnace, a tail gas treatment system, and a gas treatment system and a protective gas circulation system cooperate with each other to realize the multi-level rational utilization of energy, and are suitable for the continuous and rapid pyrolysis and carbonization of various solid organic matter in the actual production. While realizing the polygeneration of coke, wood vinegar and tar, the maximum utilization of overall heat is realized through process optimization.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ENGERGY RES INSTITUTE OF SHANDONG ACADEMY OF SCIENCESNot Provided

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cui, Zhaojie Jinan, CN 1 0
Gu, Zhijie Jinan, CN 3 4
He, Likun Jinan, CN 1 0
Hua, Dongliang Jinan, CN 2 5
Li, Yonggang Jinan, CN 87 422
Liang, Xiaohui Jinan, CN 10 30
Liu, Suxiang Jinan, CN 1 0
Si, Hongyu Jinan, CN 1 0
Sun, Laizhi Jinan, CN 1 0
Wang, Bing Jinan, CN 403 3504
Wang, Haichao Jinan, CN 38 315
Xu, Meirong Jinan, CN 4 27
Yang, Shuangxia Jinan, CN 1 0
Yao, Qiang Jinan, CN 49 143

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 26, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 26, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 26, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00