Hybrid power plant optimization for inclement weather

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12155340
APP PUB NO 20220077813A1
SERIAL NO

17417090

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments herein describe optimizations for hybrid power plants that include wind turbine generators and photovoltaic generators by determining solar tracking setpoints for a field of photovoltaic generators co-located with a wind turbine generator, wherein the solar tracking setpoints orient a collector face for each photovoltaic generator sunward; in response to determining based on data received from the wind turbine generator that an airborne impactor event is occurring, adjusting the solar tracking setpoints to reposition the collector face out of a trajectory for airborne impactors; and transmitting the setpoints to tracking motors for the photovoltaic generators of the field.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VESTAS WIND SYSTEMS A/S8200 AARHUS N

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Demsa, Loránd Aarhus C, DK 3 3
Raghuchandra, Karthikeya Balladi Aarhus N, DK 6 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 26, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 26, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 26, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00