Method for indicating reference signal configuration information, base station, and terminal

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12155586
APP PUB NO 20230239090A1
SERIAL NO

18192470

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are a method for indicating reference signal configuration information, a base station and a terminal. The method includes that a first communication node determines joint signaling and the first communication node transmits the joint signaling to a second communication node. The joint signaling includes first information and second information. The first information includes at least one of the following: quasi-colocation configuration information and configuration information of a transmission beam. The second information includes at least one of the following: configuration information of a phase tracking reference signal and configuration information of a demodulation reference signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZTE CORPORATIONZTE PLAZA KEJI ROAD SOUTH HI-TECH INDUSTRIAL PARK NANSHAN SHENZHEN GUANGDONG 518057 518057

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gao, Bo Guangdong, CN 577 2816
Jiang, Chuangxin Guangdong, CN 390 680
Li, Yu Ngok Guangdong, CN 308 1361
Lu, Zhaohua Guangdong, CN 705 2021
Mei, Meng Guangdong, CN 73 120
Wu, Hao Guangdong, CN 930 3100
Zhang, Nan Guangdong, CN 491 2425

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 26, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 26, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 26, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00