Machine and method for applying tubular shrink sleeve material to objects

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12157246
SERIAL NO

18442827

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A machine for applying tubular film to objects includes a mandrel about which a tubular film is passed, a perforation assembly for forming a perforation line across a width of the tubular film prior to the tubular film moving onto the mandrel, and a sleeve ejection arrangement associated with the mandrel to separate the tubular film along the perforation line to create a tubular sleeve that is ejected off of the mandrel and onto an object. The perforation assembly includes a perforation unit mounted for movement across the width the tubular film, the perforation unit including a perforation blade that is rotated over the tubular film, to apply the perforation line, as the perforation unit moves across the width of the tubular film.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AXON LLC3080 BUSINESS PARK DRIVE SUITE 103 RALEIGH NC 27610

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Duncan, Adam W Apex, US 12 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 3, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 3, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 3, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00