English Title Not Available

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12157795
APP PUB NO 20210002421A1
SERIAL NO

16979348

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In one or more embodiments, the present invention is directed to a novel method for synthesizing Mg(BHT)2(THF)2 catalyst, which has several advantages over previous methods. Dry toluene or pentane are not required for synthesizing the catalyst, and the reaction is done in a bulk solution of BHT and THF. Further, because the Mg(BHT)2(THF)2 is made in a one-step (“one-pot”) synthesis, the time required for synthesizing and drying the catalyst is reduced. Using the new method of the present invention, the Mg(BHT)2(THF)2 is pure after removing excess THF, thereby eliminating the need for washes and recrystallization.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE UNIVERSITY OF AKRON302 BUCHTEL COMMON AKRON OH 44325

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Becker, Matthew Chapel Hill, US 44 198
Kleinfehn, Alex P Cuyahoga Falls, US 1 0
Petersen, Shannon R Youngwood, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 3, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 3, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 3, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00