Hydrogen production by red mud-supported nickel-based catalysts and methods of preparation thereof

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12162000
SERIAL NO

18746132

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for generating hydrogen (H2) includes introducing a H2-containing feed gas stream into a reactor containing a red mud-supported nickel (Ni-SRM) catalyst including Ni-SRM catalyst particles. The method further includes passing the H2-containing feed gas stream through the reactor to contact the H2-containing feed gas stream with the Ni-SRM catalyst particles at a temperature of 500° C. to 700° C. to form an activated Ni-SRM catalyst and terminating the introducing the H2-containing feed gas stream. The method further includes introducing and passing CH4-containing feed gas stream through the reactor to contact the CH4-containing feed gas stream with the activated Ni-SRM catalyst at a temperature of 600° C. to 1000° C. thereby converting at least a portion of the CH4 to carbon and H2.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KING FAHD UNIVERSITY OF PETROLEUM AND MINERALSP O BOX 5071 INNOVATION AND INDUSTRIAL RELATION INNOVATION CLUSTER BUILDING DTV DHAHRAN 31261

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hossain, Mohammad Mozahar Dhahran, SA 23 61
Khan, Wasim Ullah Dhahran, SA 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 10, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 10, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 10, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00