Metal clad laminated plate and method for manufacturing metal clad laminated plate

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12162257
APP PUB NO 20230145377A1
SERIAL NO

18150008

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing a metal clad laminated plate includes hot pressing a laminated body by a double belt press method. The laminated body includes an insulating film containing the liquid crystal polymer and the metal foil lying on the insulating film. In hot pressing the laminated body, a highest heating temperature is higher than or equal to a temperature lower than a melting point of the insulating film by 5° C. and lower than or equal to a temperature higher than the melting point by 20° C. The highest heating temperature is maintained for longer than or equal to 20 seconds and shorter than or equal to 120 seconds.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTDOSAKA-SHI OSAKA 540-6207

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ito, Yusuke Mie, JP 94 687
Komori, Kiyotaka Hyogo, JP 23 135
Koyama, Masaya Mie, JP 15 32
Matsuzaki, Yoshinori Mie, JP 9 9
Takahashi, Hiroaki Mie, JP 436 3274

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 10, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 10, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 10, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00